Solar Park South - International Online - project 118 of 201 |
|
||||
Here Comes The Sun | page 2 (page 1) | ||||
pierfrancesco celani (italy), fedele marino (italy), valentina rocca (italy), giovanni mazzuca (italy), mirko tucci (italy), gaetano saullo (italy) | |||||
In Techno Park, A3-lines have an optimal South exposure, allowing low-cost installations and energetic efficiency. In Eco Park, photovoltaic integrations allows the re-naturalization of the lines. The two Power Stations have been mainly structured according to the energy requirement of the Bagnara-Scilla area (about 2.200.000kW/h, supplying a total power of 1,5MW). Considering the annual insolation hours and assuming for the area a value of 1500 hours, the effective annual productivity of the Power Stations is: 1,5x1500=2.250.000kWh/year, that satisfies the public consumption of the area. The total cost, technical areas included, approximately is 4.500.000€. Considering their productivity, they have an annual reward of 202.500 € and also considering the GSE incentives (non integrated systems - 0,346€/kW/h on 2010), it could be added a reward of 778.500,00€, for a total reward of 981.000€. So the time of return for depreciation of the power stations potentially is 4,6 years. |