The project consists in the demolition of road surface and some of superior structure, that replaces by one less heavy. Inside the viaduct there'll be a gravel drainage layer, an anti-root and a layer of farmland for planting the trees. While the pedestrian path will made in natural materials: clay. Inside the viaduct will be created a dry lining for passage facilities. The support structure of fotovoltaic pannels will be made entirely in wood to ensure maximum sustainability. Also the info point will be made in wood and it'll be removable if it's necessary. The project will be different for each viaduct, because the internal structures are very different. The estimated amount is about a million for kilometer, so it's about ten million for all the project. |