Solar Park South - International Online -  project 116 of 201  
maestrale page 2 (page 1)
salvatore millitari (italy)
In detail: A) New Path for S.S.18 (old track north-south): installation of platforms for the production of energy; B) Because of the favorable position of the A3, along the old path, direction South-North, will be installed wind turbines with solar panels, organic gardens are made of raisins and vines to grow, these will be system for reuse of rainwater; C) On the Gazziano’s viaduct will be built a building “laboratory” and a “tourist station”, users can go only on foot or by bicycle, and can play jogging, seating on deck, or work in organic gardens of the park. The laboratory will be operated equipment installed in the park and perform the research and experimentation on eco-energy. ---The approximate cost of the work is Euro 12.000.000,00